WorkSafeBC Tower Crane Report

Updated: WorkSafeBC Tower Crane Report

// October 9, 2025

As per OHSR 14.75, a qualified supervisor must complete a report after a tower crane is erected, climbed, or repositioned on a worksite.

WorkSafeBC has created an updated document, the Tower Crane Report for industry use. This report was formerly named the Construction Site Tower Crane Report and commonly referred to as the “Erector’s Report”.

Crane supervisors can use this report to meet the requirements of OHSR 14.75. 
The document should be kept for reference in your crane site binder.

You can find a list of required and recommended items for your crane site binder on our BC Crane Safety knowledge base page: Tower Crane Site Binder.

Visit WorkSafeBC to download a copy of this report.